The Corporation of the Township of Laird

Roads Department 5-Year Plan 2026 to 2030

Township of Laird – 5-Year Road Plan, 2026 to 2030

Approved by Motion #: 07-26

2026 Draft

Double Surface Treatment

RoadActivityRational
Lake George RoadDouble 1,650 meters

Single Surface Treatment

RoadActivityRational
Government RoadTownline to Reids Road3,500 meters
Same road as aboveTownline Highway to Government1,600 meters
Same road as aboveLapish Road1,400 meters

Resurface Gravel

RoadActivityRational
Yard (stock)25 loads
Lake George Road40 loads (capital)

Ditching

RoadActivityRational
Neebish Road WestMacDonald Drive to Finns’ Bay Rd800 meters north side

Culverts

None listed.

Estimated costs:

  • Road repair in preparation for surface treatment will be approximately $10,500.00
  • Surface treatment to cost approximately $318,500.00
  • Gravel cost approximately $35,750.00

2027 Draft

Double Surface Treatment

None listed.

Single Surface Treatment

RoadActivityRational
Government RoadPumpkin Point to Riley Rd1800 meters NOTE: Amended
struck out: Lapish Road
Pumpkin Point Rd EastGovernment to Highway1600 meters

Resurface Gravel

RoadActivityRational
Yard (stock)20 loads
Riverside Drive30 loads
Cemetery Road20 loads

Ditching

RoadActivityRational
Lake George Road West1050 meters bridge east to #104 south side
Pumpkin Point Road West150 meters Lakeview west to cross culvert south side

Culverts

None listed.

2028 Draft

Double Surface Treatment

RoadActivityRational
Riverside Drive1,000 meters new surface treatment

Single Surface Treatment

RoadActivityRational
Neebish Road WestMacDonald Drive to Finns’ Bay, 1600 meters

Resurface Gravel

RoadActivityRational
Yard Stock20 loads
Riverside Drive30 loads
Cemetery Road30 loads

Ditching

RoadActivityRational
Calabogie – South SideRydall’s to Lake, approximately 1,000 meters
Lake George Road EastBottom of hill to large Cross Culvert, approximately 700 m

Culverts

RoadActivityRational
Large cross culvert on Lake George Road60 feet x 8 feet

2029 Draft

Double Surface Treatment

RoadActivityRational
Cemetery Road1,000 metres

Single Surface Treatment

RoadActivityRational
Pumpkin Point Road WestHighway to Porchuck 3,200 metres

Resurface Gravel

RoadActivityRational
Cemetery Road30 loads
Lake Shore Drive20 loads
Yard20 loads
Hillstrom Road10 loads

Ditching

RoadActivityRational
Lakeshore DriveAll West and East sides 1,400 meters
Hillstrom RoadWest side 500 meters

Culverts

None listed.

2030 Draft

Double Surface Treatment

RoadActivityRational
Lake Shore Drive700 metres
Hillstrom Drive500 metres

Single Surface Treatment

RoadActivityRational
Townline Road West1,400 metres

Resurface Gravel

RoadActivityRational
Yard20 loads
Hillstrom Road10 loads

Ditching

RoadActivityRational
Reids RoadBoth sides
Highway to Lakeview3,200 metres

Culverts

None listed.

For an accessible format or communication support, contact the Township office at 705-248-2395 or info@lairdtownship.ca.