Double Surface Treatment
| Road | Activity | Rational |
|---|---|---|
| Lake George Road | Double 1,650 meters |
Single Surface Treatment
| Road | Activity | Rational |
|---|---|---|
| Government Road | Townline to Reids Road | 3,500 meters |
| Same road as above | Townline Highway to Government | 1,600 meters |
| Same road as above | Lapish Road | 1,400 meters |
Resurface Gravel
| Road | Activity | Rational |
|---|---|---|
| Yard (stock) | 25 loads | |
| Lake George Road | 40 loads (capital) |
Ditching
| Road | Activity | Rational |
|---|---|---|
| Neebish Road West | MacDonald Drive to Finns’ Bay Rd | 800 meters north side |
Culverts
None listed.
Estimated costs:
- Road repair in preparation for surface treatment will be approximately $10,500.00
- Surface treatment to cost approximately $318,500.00
- Gravel cost approximately $35,750.00
2027 Draft
Double Surface Treatment
None listed.
Single Surface Treatment
| Road | Activity | Rational |
|---|---|---|
| Government Road | Pumpkin Point to Riley Rd | 1800 meters NOTE: Amended |
| Pumpkin Point Rd East | Government to Highway | 1600 meters |
Resurface Gravel
| Road | Activity | Rational |
|---|---|---|
| Yard (stock) | 20 loads | |
| Riverside Drive | 30 loads | |
| Cemetery Road | 20 loads |
Ditching
| Road | Activity | Rational |
|---|---|---|
| Lake George Road West | 1050 meters bridge east to #104 south side | |
| Pumpkin Point Road West | 150 meters Lakeview west to cross culvert south side |
Culverts
None listed.
2028 Draft
Double Surface Treatment
| Road | Activity | Rational |
|---|---|---|
| Riverside Drive | 1,000 meters new surface treatment |
Single Surface Treatment
| Road | Activity | Rational |
|---|---|---|
| Neebish Road West | MacDonald Drive to Finns’ Bay, 1600 meters |
Resurface Gravel
| Road | Activity | Rational |
|---|---|---|
| Yard Stock | 20 loads | |
| Riverside Drive | 30 loads | |
| Cemetery Road | 30 loads |
Ditching
| Road | Activity | Rational |
|---|---|---|
| Calabogie – South Side | Rydall’s to Lake, approximately 1,000 meters | |
| Lake George Road East | Bottom of hill to large Cross Culvert, approximately 700 m |
Culverts
| Road | Activity | Rational |
|---|---|---|
| Large cross culvert on Lake George Road | 60 feet x 8 feet |
2029 Draft
Double Surface Treatment
| Road | Activity | Rational |
|---|---|---|
| Cemetery Road | 1,000 metres |
Single Surface Treatment
| Road | Activity | Rational |
|---|---|---|
| Pumpkin Point Road West | Highway to Porchuck 3,200 metres |
Resurface Gravel
| Road | Activity | Rational |
|---|---|---|
| Cemetery Road | 30 loads | |
| Lake Shore Drive | 20 loads | |
| Yard | 20 loads | |
| Hillstrom Road | 10 loads |
Ditching
| Road | Activity | Rational |
|---|---|---|
| Lakeshore Drive | All West and East sides 1,400 meters | |
| Hillstrom Road | West side 500 meters |
Culverts
None listed.
2030 Draft
Double Surface Treatment
| Road | Activity | Rational |
|---|---|---|
| Lake Shore Drive | 700 metres | |
| Hillstrom Drive | 500 metres |
Single Surface Treatment
| Road | Activity | Rational |
|---|---|---|
| Townline Road West | 1,400 metres |
Resurface Gravel
| Road | Activity | Rational |
|---|---|---|
| Yard | 20 loads | |
| Hillstrom Road | 10 loads |
Ditching
| Road | Activity | Rational |
|---|---|---|
| Reids Road | Both sides | |
| Highway to Lakeview | 3,200 metres |
Culverts
None listed.