The Corporation of the Township of Laird

Roads Department 5-Year Plan 2025 to 2029

Township of Laird – 5-Year Road Plan, 2025 to 2029

Approved by Motion #: 06-25, January 16, 2025

2025 Draft

Double Surface Treatment

RoadActivityRational
struck out: Lake George Road Eaststruck out: 1650 metersNOTE: Remove from plan

Single Surface Treatment

RoadActivityRational
Bar River Road Tracks to Cemetery Road3600 meters
struck out: Lapish Road Tracks to Lake George Roadstruck out: 1400 metersNOTE: Remove from plan
Government Rd – Riley Road to Bar River Road3600 metersNOTE: New to plan
Calabogie – Lakeview to Lakeshore1000 metersNOTE: New to plan
Neebish – Highway to MacDonald Drive1600 metersNOTE: New to plan

Resurface Gravel

RoadActivityRational
struck out: Riversidestruck out: 10 loadsNOTE: Remove from plan
struck out: Cemetery Roadstruck out: 15 loadsNOTE: Remove from plan
struck out: Lake Shore Drivestruck out: 10 loadsNOTE: Remove from plan
Yard (stock)20 loads
Lake George Road40 loads (capital)NOTE: New to plan

Ditching

RoadActivityRational
Rydall Mill Roadfrom #87 east to #178 north side 450 meters
Finns’ Bay RoadNeebish west 300 meters to # 73 north side

Culverts

None listed.

Estimated costs:

  • Road repair in preparation for surface treatment will be approximately $14,600.00 (capital)
  • Surface treatment to cost approximately $265,320.00
  • Gravel costs approximately $30,000.00
  • Rental of brushing equipment to conduct heavy brushing of all of Township – Approximately $10,000.00

2026 Draft

Double Surface Treatment

RoadActivityRational
Lake George RoadDouble 1,650 metersNOTE: New to plan

Single Surface Treatment

RoadActivityRational
Government RoadTownline to struck out: Pumpkin Point Road Reids Roadstruck out: 5200 3,500 meters NOTE: Amendment
Same road as aboveTownline Highway to Government1,600 meters
Same road as aboveLapish Road1,400 meters

Resurface Gravel

RoadActivityRational
Yard (stock)25 loads
Lake George Road40 loads (capital)NOTE: New to plan

Ditching

RoadActivityRational
Neebish Road WestMacDonald Drive to Finns’ Bay Rd800 meters north side

Culverts

None listed.

Estimated costs:

  • Road repair in preparation for surface treatment will be approximately $10,500.00
  • Surface treatment to cost approximately $318,500.00
  • Gravel cost approximately $35,750.00

2027 Draft

Double Surface Treatment

None listed.

Single Surface Treatment

RoadActivityRational
Government RoadPumpkin Point to struck out: Bar River Riley Rdstruck out: 5100 1800 meters NOTE: Amended
struck out: Lapish RoadNOTE: Removed from plan
Pumpkin Point Rd EastGovernment to Highway1600 meters NOTE: New to plan

Resurface Gravel

RoadActivityRational
Yard (stock)20 loads
Riverside Drive30 loadsNOTE: New to plan
Cemetery Road20 loadsNOTE: New to plan

Ditching

RoadActivityRational
Lake George Road West1050 meters bridge east to #104 south side
Pumpkin Point Road West150 meters Lakeview west to cross culvert south side

Culverts

None listed.

2028 Draft

Double Surface Treatment

RoadActivityRational
Riverside Drive1,000 meters new surface treatmentNOTE: New to Plan

Single Surface Treatment

RoadActivityRational
Neebish Road Weststruck out: Highway MacDonald Drive to Finns’ Bay,struck out: 3,300 1600 meters NOTE: Amendment

Resurface Gravel

RoadActivityRational
Yard Stock20 loads
Riverside Drive30 loadsNOTE: New to Plan
Cemetery Road30 loadsNOTE: New to Plan

Ditching

RoadActivityRational
Calabogie – South SideRydall’s to Lake, approximately 1,000 meters
Lake George Road EastBottom of hill to large Cross Culvert, approximately 700 m

Culverts

RoadActivityRational
Large cross culvert on Lake George Road60 feet x 8 feet

2029 Draft

NOTE: 2029 is new to plan

Double Surface Treatment

RoadActivityRational
Cemetery Road1,000 metres

Single Surface Treatment

RoadActivityRational
Pumpkin Point Road WestHighway to Porchuck 3,200 metres

Resurface Gravel

RoadActivityRational
Cemetery Road30 loads
Lake Shore Drive20 loads
Yard20 loads
Hillstrom Road10 loads

Ditching

RoadActivityRational
Lakeshore DriveAll West and East sides 1,400 meters
Hillstrom RoadWest side 500 meters

Culverts

None listed.

2030 Draft

NOTE: 2030 is new to plan

Double Surface Treatment

RoadActivityRational
Lake Shore Drive700 metres
Hillstrom Drive500 metres

Single Surface Treatment

RoadActivityRational
Townline Road West1,400 metres

Resurface Gravel

RoadActivityRational
Yard20 loads
Hillstrom Road10 loads

Ditching

RoadActivityRational
Reids RoadBoth sides
Highway to Lakeview3,200 metres

Culverts

None listed.